Materials Rates
Full Load (6+ cubic yards)
3/4 Load (5+ cubic yards)
1/2 Load (4+ cubic yards)
1/4 Load (2+ cubic yards)
These rates apply to materials such as concrete,soil, rocks, dirt, asphalt shingles, drywall, etc. in large quantity.
£450.00
£350.00
£225.00
£120.00
Labor Rates: Up to 2 man-hours (1 hour x 2 men) of loading time on site is included.
Additional labor is billed at £40.00 per man-hour.
*Due to weight restrictions a full load might be divided into two trucks
**Disassembly of items may incur labor charge